Critical Thinking Strategies in Decision Making

By Steve Jones

Problem Analysis Article

Critical thinking is an essential part of everyone's daily lives and is not reserved for just the workplace and/or school. "Critical thinking is valuable in many contexts outside the classroom and the workplace" (Bassham, 2002, p. 27). The simplest decisions can have huge affects if the critical thinking process is not used. The problem described below is a good example of how small choices can impact an organization and its members in a detrimental way. The reader will see the product of what happens when the critical thinking process is left out and decisions are made on a whim.

"Computers cannot make decisions involving values and risk preferences. Here, human judgment is required" (Bazerman, 2002, p. 5); hence, the primary problem being that the Person in Charge (PIC) is not familiar with scale read-outs and therefore requires the assistance of the Mass Production Engineer (MPE) to complete the task safely and successfully. Due to a serious lack of judgment, miscommunication, and role ambiguity the uploading process had to be shut down in order to avoid a safety hazard. This series of problems violated safety measures and had the potential to negatively impact the companies bottom-line.

When the Spacecraft was being transferred from tooling to the transportation cart the PIC alerted the Manager that there was a problem, which led to the operation being halted. Once the Spacecraft was off-loaded, the PIC, Quality Inspector, Quality Engineering, Vehicle Engineer, and Manager assessed the situation. An Incident Report and an Electronic Process Anomaly Record were generated and an immediate investigation was launched. All personnel involved in the situation were interviewed and all data was collected. Additionally, photographs were taken of all the pertinent tooling and flight hardware.

The goal was to get to the root cause of the problem. The objective was to prevent this situation from recurring and to disseminate the findings to the enterprise. A Root Cause and Corrective Actions (RCCA) method, using Six Sigma, was used to frame the problem. When the RCCA committee gathered, a brainstorming session was initiated to obtain maximum information. A problem statement was formed and the background of the problem was investigated, which led to the exercise of containment actions. The result of the investigation was documented using a fault tree, of which the root causes were determined. Corrective actions were assigned to the responsible parties and estimated completion dates were announced; all findings and actions were implemented. All information and findings were then disseminated to the enterprise. The process was concluded when the Corrective Action Board documented all lessons learned in order to help the enterprise be proactive in all future activities.

The problems encountered with the PIC and MPE have made the organization liable for physical injuries and monetary losses. Due to the lack of judgment, product knowledge, and the breakdown of communication the organization is now required to thoroughly investigate the matter. The organization also has to invest additional time and money toward the formation of a Root Cause and Corrective Action Team. Additionally, the organization has the added expense of cross-training and offering continuing education in order to reduce the risk of the same problem happening again.

The problem that occurred is easily resolved, but if left unchecked the problem can cause further problems that affect the organization and its members. The decision-making models show many methods of solving problems, but mostly that the circle of improvement goes on. The company could implement an "always at your station" guideline, among others. The guideline, however, is not going to help the team solve the underlying problem of bad judgment. If common sense is used, the problem will be solved immediately. If the employees have difficulty using good judgment the team could possibly implement additional safety training as a reminder of how to stay safe.

The causes and forces of influence are relatively intangible because they have their root in the minds of all the employees involved in the operation. A foundation must first be laid in order to prevent similar incidents. The foundation, in this case, will indeed be a large quantity of paperwork, which includes many different forms and reports. Once proper information has been gathered and organized the information will then need to be disseminated and incorporated into existing procedures, and more notably, into the minds of the employees. The main force needed to accomplish the desired influence will be primarily monetary. Money is needed because physical documents, training, and man-hours all come at a price. Although money can and will fix the problem, funds must be carefully allocated and controlled.

Calibrating, training, and communication are some measurements that can be used to prevent reoccurring problems. To ensure the scale read-out is working properly, the scale should be calibrated once a month and logged for tracking purposes. The PIC and MPE should be aware of each other's job responsibilities in order to reduce role ambiguity; therefore, additional training should be given to both. Because the PIC and MPE are required to work together as a team, each party needs to remain in constant communication during lift operations; abandoning ones station is not an option. Furthermore, the PIC and MPE should ask questions when in doubt; this will help to reduce safety hazards.

One of the most effective methods for measuring a desired result is constructing a checklist of all the necessary procedures to be carried out. The checklist would consist of observations of proper calibration, lifting technique, communication, and all other necessary procedures. In order for the checklist to be properly evaluated it should be completed and carried out by an objective observer. Monetary resources are undoubtedly tight in the organization; therefore, said resources should be periodically monitored. However, the identity of the person doing the evaluation should be kept confidential. The criteria should be based on the checklist of all the necessary procedures including dynamic communication. The organization should conduct an example lift with a top PIC and MPE, wherein every employee is required to observe and thus base his or her actions on. A history of flawless execution of the procedure would be used to determine a successful outcome.

Alternative solutions include the PIC and MPE taking into consideration that each party will inevitably make individual decisions; however, when said decisions affect all aspects of the operation, each party needs to communicate his or her thoughts because one wrong decision could wipe out the entire operation and/or cause physical injury. "Tough decisions can produce bad outcomes no matter what precautions decision makers take, because key factors that influence the outcome is often governed by chance events. Bad decisions occur when foreseeable events are not recognized and managed" (Nutt, 1989, p. 42). The MPE could have avoided the risk of safety hazards by determining the scope and limitations before leaving his post, as the MPE had more experience and was directed to assist the PIC. Making a decision implies different alternative choices to be considered, but the key is to choose the solution(s) that best fits with company's goals and desires.

In conclusion, the MPE's bad judgment was due to his lack of critical thinking skills. Using a decision-making model, even in the simplest form, may have prevented the problem from occurring in the first place. Sometimes, when minute decisions are made, one may think that he or she does not need to analyze said decisions thoroughly; however, the above example proves otherwise. This example should help many understand why the critical thinking process is so important and how even the smallest of choices can make a tremendous impact.

References:
Bassham, G. (2002). Introduction to Critical Thinking. In (Ed.), Critical Thinking: A Student's Introduction, 1e (pp. 1-65). New York, NY: The McGraw-Hill Companies.

Jones, S (2012) http://www.study-aids.co.uk/busman/busman_essays.html

Bazerman, M. H. (2002). Introduction to Managerial Decision Making. In (Ed.), Judgment in Managerial Decision Making (pp. 5-29). New York, NY: John Wiley & Sons, Inc.

Nutt, P. C. (1989). Preventing Debacles by Improving Decision Making. In (Ed.), Making Tough Decisions: Tactics for Improving Managerial Decision Making (pp. 1-43). New York, NY: John Wiley & Sons, Inc.

Monday, April 2, 2012

The Execution of Details and the Role of Project Management

Author: John R. Daly

© 2012

The definition of project management is the implementation of specific tasks that have a well-defined start and end resulting in a desired outcome. Furthermore, the implementation of critical paths relative to the persistence in establishing achievable goals, management of time, financial planning, use of resources, risks, supply chain management, and resolution of any organizational issues that would hinder a project's success.

Projects involve people, people working together towards common responsibilities and goals. Training is an essential prerequisite for all project team members as it brings clarity and a sense of commitment to a project. This is achieved by making the concepts and processes of project management understandable to all involved by installing discipline and the bringing together of ideas to achieve empirical end results.

The business concept of determining market trends, due diligence, and actual return on investment is crucial. Effective utilization of the key objectives will instill in all levels of the organization the empowerment to develop and establish information, resolve conflicting views, work in collaboration on all projects, and to build confidence and enthusiasm.

One main goal in the implementation of project management is to improve the flow of information, documentation, and innovative thinking throughout the organization. The distribution of information within an organization will determine team and personal responsibilities, delegation of tasks, and to promote a corporate culture of teamwork. A project manager's primary responsibility is to communicate to all in the organization what the company is trying to accomplish, the importance in maintaining a competitive market advantage, and how it can be accomplished.

Effective methods of communication, focus, and maintaining process management control are not capabilities we instinctively acquire. Education and training in project management, within the scope of today's business environment, are an essential element to achieve successful results.

The adherence to the tasks forms the implementation in establishing achievable goals, management of time, financial planning, supply chain management, and resolution of any organizational issues that would hinder a project's success.

The longer a project takes to arrive at steady-state production the less of an impact it will have on its market share. External factors, out of the project manager's control, can lead to changes in direction. A dedicated project manager must recognize that change has to be accepted as part of the overall development process. This paradigm can be better expressed as applying analytical methods to determine the needs of the organization and corrective actions to resolve any sudden changes or failure modes.

Within this methodology, the design and implementation of updated procedures and new processes in reacting to unexpected project changes must include plans for correction as a response to change, the administration of change, and the assimilation of change in the project.

The project manager governs the number of tasks, information, and methods required to identify business needs, cost-value relations, intended cycle life of products, the intended market, supply chain management, and other areas they will have fiduciary responsibility for and create solutions to business problems. The application of due diligence and return on investment is crucial. Businesses are extremely reluctant to move forward on any program without due diligence. Those in project management need to understand these business concepts.

Being a project manager can be an unappreciated role by being in the forefront of internal differences between the sales (what people want) and engineering (what people will get) groups until the project manager feels little or no support. It is now the appropriate time to change the company culture. As with any culture change or changes from the old ways, senior management must unswervingly support the project manager's decisions and supervise corporate implementation. Having this process as part of the new business plan will mandate the definition of the organization, its structure, and responsibilities.

Author: John R. Daly